Translate
Twitter Icon Facebook Icon Facebook Icon Facebook Icon
Slider Accent

Documents & Reports

Public Works
Sam Bunton, Director
915 8th Street, Suite 125, Marysville, CA 95901
Phone: (530)749-5420      Fax: (530)749-5424
email: [email protected]
Forms
Agree to Pay Form
Deferment Agreement Notice
Elevation Certificate Form (fillable)

Encroachment Permit Application (fillable)
Environmental Concerns Form
Grading Permit Application (fillable)
Hammon Grove / Sycamore Ranch Caretaker Application
Parade / Event Permit Application

Pool Disclosure
Road Closure Request
Traffic Control Conditions of Acceptance
Traffic Control Checklist
Traffic Control for Road Closure Check List
Transportation Permit Form (fillable)
Vendor Permit Application

Reports

ADA Transition Plan 2019
     PDF

Bike and Pedestrian Mobility Plan
Bicycle and Pedestrian Mobility Draft Report 2024  PDF
Submit comments here before April 30, 2024:  Link

Bikeway Master Plan
Complete  Bikeway Master Plan Update (Excluding Appendices)    PDF  (14.2 mb)
Complete  Appendices    PDF  (45.7 mb)
Final Bicycle Network Map   PDF

SACOG (
Sacramento Area  Council of Governments
) created a map  showing existing trails, bike lanes and bike routes in Yuba  County and bicycle routes proposed by the County.  SACOG Map

Local Roadway Safety Plan
Community Engagement     Link

Parks Master Plan

Final Parks Master PlanAdopted 02/19/2008              PDF
Parks Master Plan Appendices: Dated 02/11/2008       PDF
For additional  questions contact Nic Clavel at: [email protected]

Plumas Lake Specific Plan / North Arboga Study Area Road Nexus Study
Draft Hearing Report Dated:  June 2014   PDF

Yuba County Drainage
Board Presentation February 28, 2023   PDF

South Yuba Drainage Master Plan
SYDMP Area of Benefit Map     PDF
1992 SYDMP  
PDF  (28.1 mb)

2012 SYDMP  Due to the size of this pdf, it is broken into 5 parts for easier downloading.
SYDMP Part 1   PDF
SYDMP Part 2   PDF
SYDMP Part 3   PDF
SYDMP Part 4   PDF
SYDMP Part 5   PDF

SR 65 Employment Village Infrastructure Technical Master Plan     PDF  (141.5 mb)

Three Rivers Levee Fee Nexus Study Update
Fee Effective August 8, 2021   PDF

Traffic Undulation Program     PDF 

Transportation Master Plan 2020-2024        PDF